CURRENT ISSUES IN TUSHYKYDUK AND SHEBIR VILLAGES REVIEWED
During a working visit, Mangystau District Akim Yergali Skendirov visited several social facilities in the two villages.
In Tushykyduk village, the district akim visited the fire station located near the rural akimat. Issues concerning the equipment provided to rescuers and their working conditions were discussed. It was also instructed to consider ways to increase their salaries.
The visit also addressed the need to upgrade the heating system and repair the facade of the rural medical outpatient clinic, replace the seats in the concert hall of the House of Culture, eliminate technical defects, and provide additional space for the library.
Furthermore, attention was drawn to the need to organize the effective removal of household waste that has accumulated since 2000.
In Shebir village, the sports hall requires major renovation. It was instructed to first conduct a technical assessment and determine the feasibility of carrying out renovation works. If the renovation is deemed impractical, the possibility of constructing a new sports complex will be considered.
It was also noted that the kindergarten building lacks a sports hall, an assembly hall, a storage room, and a canteen. The possibility of constructing an extension to the building needs to be considered.
Regarding the medical outpatient clinic, instructions were given to inspect the heating system, renovate the facade, and prepare cost estimates to eliminate technical defects.
At the Daria water distribution center, it was instructed to assess the quality of previously completed repair works, review the contractor's responsibility, and prepare new cost estimates to rectify the identified defects.
Following the working visit, the responsible officials were instructed to thoroughly examine each issue raised and propose specific solutions.
Follow memleket.kz on social media
Important news from Kazakhstan and useful articles on the platform you prefer.



